Actions

AE31

Difference between revisions of "AE31"

m
m (1 revision imported: 2024 Update)
Line 1: Line 1:
{{this}} (OEE) measures the ability to efficiently utilize production equipment (or assets). It measures how much of the time your manufacturing asset is running at full capacity and output good products.
+
{{this}} measures ..
 
===Calculation===
 
===Calculation===
{{math|{{this}}|[[m:AE31]] × [[m:AE32]] × [[m:AE33]]}}
+
{{math|{{this}} Ratio|{{frac|Run Time|Planned Production Time|100 %}}}}
{{where|%|[[m:AE31]]|The percentage of time the equipment is ready and able to run, excluding planned and unplanned downtime.|[[m:AE32]]|The percentage of time the equipment is running at its maximum speed, without minor stops or slow cycles.|[[m:AE33]]|The percentage of good parts produced, excluding defects or rework.
+
where:
}}
+
* Run Time =
 +
* Planned Production Time =
 +
Unit of measure:  
 
===Importance===
 
===Importance===
An {{this}} approaching 100% means that the equipment is always available and running (~100% Equipment Availability) <u>and</u> running at maximum speed with no minor stops or slow cycles (~100% Equipment Performance) <u>and</u> product is made with no defects or rework (~100% Produced Quality).
 
 
===Notes===
 
===Notes===
In most industries:
+
<ins>
* 85% or more is considered world class
+
</ins>
* 60% is typical performance
+
[[Category:Metric]]
* 40% is considered lagging, but not uncommon for manufacturers new to OEE.
 
[[Category:Metric]][[Category:Supply Chain]]
 
 
{{Object
 
{{Object
|name=Overall Equipment Efficiency
+
|name=Equipment Availability
|parent=m:AE
+
|parent=m:AE3
|sort=53000
+
|sort=53100
|level=1
+
|level=2
|keywords=Productivity,Equipment,Performance,Manufacturing,Make,OEE
 
|description=The percentage of time production equipment is truly productive
 
 
}}
 
}}

Revision as of 21:51, 18 February 2025

Overall Equipment Efficiency measures ..

Calculation

Overall Equipment Efficiency Ratio
=
Run Time   × 100 %
Planned Production Time

where:

  • Run Time =
  • Planned Production Time =

Unit of measure:

Importance

Notes

Hierarchy

IDNameLevelx
AE3Total Equipment Efficiency Performance1AE3
AE31Overall Equipment Efficiency2AE31
AE311Equipment Availability3AE311
AE312Equipment Performance3AE312
AE313Produced Quality3AE313
Equipment Availability Total Equipment Efficiency Performance 53100 2 {{{keywords}}} {{{description}}}